Custom Query (964 matches)
Results (346 - 348 of 964)
Ticket | Owner | Reporter | Resolution | Summary |
---|---|---|---|---|
#445 | Done | Added scripts to compute 4D-Var error covariance standard deviation | ||
Description |
I added couple of scripts for computing the 4D-Var error covariance standard deviations which are used to convert modeled correlations into covariances.
I also updated c_grid.m, c_observations.m, and c_std.m. |
|||
#446 | Done | Added scripts in the matlab/4dvar directory | ||
Description |
Several new scripts were added to the matlab/4dvar repository:
I also renamed load_ssh_data.m to a more appropriated load_ssh_aviso.m. I made minor documentation corrections to several scripts. Many thanks to John Wilkin for providing a template for load_sst_pfeg.m. |
|||
#447 | Done | More fine tuning of several matlab scripts | ||
Description |
I updated several scripts in the matlab/4dvar and matlab/utility directories of the repository to enhance their capabilities. This stuff is complicated and the devil is in the details. We need for these scripts to be flexible. I assume that more fine tunning is required when the users start using them next week at the 4D-Var workshop. I added the grid_Lm_Mm_N global attribute to the 4D-Var observation metadata. This is needed in quality control and binning into super observations. |